Back

Safe and civilized construction of knowledge: green construction planning stages

[students] problems of construction of green construction planning stages?

[answer] 1, engineering approach planning stages

Make full use of the existing facilities on site, a reasonable increase in land, temporary housing, according to the ISO14000 environment management system and OHSAS18000 occupation health and safety management system standard, layout construction area and the Office District of life supporting facilities, equipment. The control of environmental factors make dust emissions, noise emissions, hazardous chemical leak, solid waste dumps, fire, explosion, toxic and harmful (such as concrete antifreeze agent into the ammonia odor emissions), electricity consumption of office paper consumption, specific measures. Site management of first-class, first-class environmental protection technology, to create a new chapter in green construction.

2 stage of construction planning, structure

1) reinforced by the scene processing, steel purchase by bidding, strict quality and price of steel. Steel joints by mechanical connection joint, reduce wastage. Using a plastic pad or high strength concrete block instead of short reinforced control of protective layer thickness, avoid corrosion of concrete surface.

2) the project template preparation panel system and supporting system of different materials. The premise is to ensure the quality of template, but also to ensure the lower engineering cost, save material, reduce construction waste generated at the same time, to facilitate the construction personnel and construction safety.

3) ready mixed concrete by concrete engineering, by large mixing station supply. Avoid environmental pollution, increasing occupation site layout of stirring, more important is the concrete products are guaranteed the quality and schedule coordination.

4) the process to control the amount of clean water, reduce water consumption, the use of renewable resources, control the strong noise, reduce dust, avoid the impact of light pollution on the surrounding.

5) make use of the underground water sources for precipitation, using structural concrete curing, site clean water, reduce the municipal water demand.

The 3 phase of renovation construction, planning

Decoration materials will be the use of green building materials, materials purchase by public bidding. Follow the principles: domestic production can not be material, choose the optimal cost-effective imported material, and the material must be certified and domestic environmental protection agency; domestic and imported some materials of domestic material selection, quality and price relatively better; local and foreign production of material selection, quality and transportation are ensured local materials.

The above are according to the arrangement of meeting students problems in practical work and become, for reference, if there is a problem, please timely communication.

GJ. NEWS